000 nam a22 4500
999 _c10433
_d10433
005 20191127143055.0
008 191127b ||||| |||| 00| 0 tha d
040 _aRID
_btha
_cRID
082 _aRID.631.7
_bT4i
_cV.3
100 _aConsulting Engineers
245 _aInterim report prepared for the Royal Irrigation Department, Thailand and the Asian development bank : Vollume lII - Annex F to M.
260 _aBangkok
_bTeam consulting engineers co., ltd
_c1991
710 _aRoyal Irrigation Department
942 _c12
_2ddc